Case study · Kocher+Beck Polska

A production panel for Kocher+Beck Polska

Work completed, business panel in use at the company · no before-and-after measurement

I designed and built a panel for Kocher+Beck Polska, a company that produces to order. It combines data from the MES and from SAP, calculates the delivery date from lead-time history and lets you trace every figure to its source document. I describe the rollout as a management process: decisions, roles, consent for reads and changes, and release gates.

This is an English summary of the case study, which is in Polish. No screenshots and no figures from the company's data. The figures I give concern my software and are dated. I show the architecture and the methods in a conversation.

At a glance

The company, the problem, what I did and the result

Company
Kocher+Beck Polska, a Polish manufacturing company that belongs to the German Kocher+Beck group. It produces to order.
Problem
Sales were in one system and finance in another, and the delivery-date forecast from the production system did not account for queues. Management, sales and production had no shared place for the figures, so arguing over a number replaced making a decision. A salesperson had no date they could justify.
What I did
I designed and built a panel that combines data from the MES and from SAP. It calculates the delivery date from lead-time history, shows the shop-floor queue and on-time delivery in two variants, reconciles sales with SAP and gives B2B partners a portal with their own data. For the design department I built an add-in for Autodesk Inventor.
I do not change the existing tables or the code of the source systems. I read them without locks, and writes to the MES go only through my own procedures in a separate database schema.
Result
There is: work completed, the business panel is in use at the company, and the first modules have run on the server since September 2026. The sales report from the panel matches SAP to the grosz in six report settings (checked in October 2026).
There is not: a before-and-after measurement of the effect. That is why I quote no savings and no improvement in on-time delivery.
What I will measure: the time it takes to prepare one management report and the number of questions to sales about a delivery date. I am agreeing the method with the company. I have not yet set a date for the first measurement, so I do not give one here. I will add it once it is agreed.

To the groszThe “Sales analysis by customer” report, reproduced in the panel, matches SAP in six report settings. I checked it in four independent ways (October 2026). I do not give the amounts.

Client's voice

You don't lay ten tiles at once, only one, then the next. But you have to know which one to take. The worker also has to know which part to take.

Joachim Setnik, Member of the Management Board, Kocher+Beck Polska. A remark from a conversation about the shop-floor queue, 4 October 2026, shortened, without part names. Translated from the Polish original. It describes a need, not the result of the rollout.
Industry
Production to order, short runs in many variants.
Systems
MES, SAP Business One, Autodesk Inventor add-in
Time of the rollout
First modules on the server since September 2026, work completed (as of November 2026)

What I built

Modules, roles and status

Each module has three status levels. I give only what is confirmed. “Not confirmed” does not mean “no”. It means I have no confirmation.

  • Built work on the module is finished
  • On the client's server the module runs on the company's server
  • Used daily people at the company use the module every day
Modules of the operations panel, who they are for and three status levels
ModuleFor whomBuiltOn the client's serverUsed daily
The panel as a wholeWhat is confirmed without a breakdown by module. The whole company Yes First modulesSince September 2026. Which ones exactly: not confirmed. Business panelIn use at the company. Which modules daily: not confirmed.
Management dashboardSales, finance and production in one place, pace against the monthly target, “what needs attention” alerts. Management Yes Not confirmed Not confirmed
Sales and order reportsBreakdowns by customer, product, channel and account manager, offer funnel, reconciliation with the finance system. Management, sales Yes Not confirmed Not confirmed
On-time deliveryTwo versions: against the original promise and after rescheduling, with a written method. Management Yes Not confirmed Not confirmed
Delivery date with confidenceA recommended completion date in the order form and in the partner view. Sales, partner Yes Not confirmed Not confirmed
Order target and action listA solver for the monthly target: open offers, each with a reason to go back to it. Sales, management YesScope: first stage, with the action list. Not confirmed Not confirmed
Production analysisShop-floor queue, job sequence, orders with no movement, reorder point, chance of finishing on time and a “slowed down” alert. Production manager Yes Not confirmed Not confirmed
Sales moduleOffers, orders, customers and suppliers, price calculator. A logged-in employee issues the document, and the write goes through procedures. Sales Yes Not confirmed Not confirmed
B2B partner portalOrders, offers, production, calendar, shipments, status calculated from events. A partner sees only their own data. B2B partners Yes Not confirmed Not confirmed
AdministrationPermissions, partner access, targets and thresholds, system status. The process owner controls them without a programmer. Process owner Yes Not confirmed Not confirmed
AI layerCommentary on aggregated figures and an analytical assistant that works on aggregates. Management YesSwitched off in the base configuration. Not confirmed Not confirmed
Mobile accessRead access on a phone, as an app installed from the browser. Internal users Yes Not confirmed Not confirmed

The full version

The rest is in Polish

The Polish case study also covers the starting situation, the six mechanisms of the panel, the rollout as a management process, the architecture and the current status. Read the full case study (in Polish).